1. RECEIVING THE MACHINE
|
2. POWER WASH THE MACHINE
|
3. FULL INSPECTION/WRITE-UP
|
4. PARTS PICKING
|
5. REPAIRS BEGIN
|
6. CARRIAGE ASSEMBLY (BEFORE)
|
7. CARRIAGE ASSEMBLY (AFTER)
|
8. HYDRAULIC SYSTEM REPAIRS
|
9. DRIVETRAIN DIAGNOSTICS AND REPAIRS
|
10. LIMITED ENGINE REBUILD
|
11. AXLE INSPECTION AND REBUILD
|
12. PERFORM TRANSMISSION PRESSURE TEST, REBUILD TRANSMISSION IF NECESSARY
|
13. INSPECT TIRES AND REPLACE IF REQUIRED
|
14. INSPECT/REPAIR OPERATOR COMPARTMENT & ELECTRICAL SYSTEM
|
15. FULLY SERVICE THE MACHINE
|
16. SAND THE MACHINE BY HAND
|
17. PAINT THE MACHINE
|
18. REPLACE ALL DECALS
|
19. COMPLETE "THE PRE DELIVERY INSPECTION SHEET"
|
20. FINAL INSPECTION
|
21. FINAL INSPECTION & DELIVERY
|
22. A 6 MONTH WARRANTY WILL APPLY TO ALL DRIVE TRAIN PARTS
|